Product Description

Pre-treatment section
Pretreatment section is a very important section before extraction or pressing section. It will directly affect extraction or pressing effect.
Solvent extraction section
1.The material (for pretreatment) is sent to rotary extraction by the scraper conveyor.
2.Meal is sent to toaster. Through the toaster, the solvent in the meal will separate from the meal.
3.After the oil from the rotary extraction enters into 1st evaporator and 2nd evaporator, most of the solvent in the oil is separated.
4.The oil from 2nd evaporator goes to stripping tower and almost all the solvent is separated.




Refining machine
1.Degumming: Removing the phosphatide by adding hot water,when phosphatide meets hot water, it will become
bigger and bigger, then out of tanks.
2.Deacidification:Removing the FFA by add caustic soda (for taking neutrallzation reaction).
3.Bleaching: Remove the pgment by adding bleaching earth andthe remaining bleaching earth will be filtrated by leaf
filter.
4.Deodorization: Remove the oxide, solid particle and volatide gas.
Pre-sale |
System evaluation: 1. Project basic situaction Solution: 1. The investment budget 2. Site measurement 3. Technical discussion Product selection: 1.Factory inspection 2. Site measurement 3. Technical discussion 4. Supply professional drawing and lists Win-win cooperation: 1. Sign the contract 2. Wstablish mutual benefit, strategic cooperative partnership. |
In-sale |
Design evaluation: 1. Detailed technical assessment, arrangement 2. Design of process and equipment layout Procurement: Strictly inspection, optimized selection. Installation: 1. Quality and quantity guaranteed 2. Completion of hand over Acceptance: 1. Acceptance test 2. Accepted deliverables Technical traning: 1.On-site installation and products training 2. Operation skills training 3.Maintenance training 4. Centralized technical training |
After-sale |
Technical service: Long time technical service Accessories supplying: Supplying spare parts with cost Complaint handling: 12-24 hours response mechanism Client Review: 1. Call-back 2. Regular return visit. |




Factory
Our FactoryWorkshop
Our Workshop




Warehouse
Our Warehouse
Team
Our Team
Packing & DeliveryLD stainless
LD stainless steel wing nut anchor bolt for construction fastener bags+cartons+pallets according to customer ' s requirement,LD stainless steel wing nut anchor bolt for construction fastener bags+cartons+pallets according to customer ' s requirement,








The Shandong Leaderâe grain and oil machinery companyâs experts guide installation and have good technoloLD
We make the cooperation with Leaderâe group many times. Their experts guide installation on-site and after-sales team provides 24 hours of technical services.
I think they have done a well in this respect. Among the large number of grease equipment manufacturers, they are very good in China. Hope we can continue to cooperate in the future.




Shandong Leaderâe grain and oil machinery companyâs equipment have good quality, and shipped on time.
We make the cooperation with Leaderâe group for long time. Because they are manufacturer, their equipment have good quality assurance and reasonable price. They shipped on time after we finish contract.
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 30 days if the goods are not in stock, it is according to quantity.
Q: How long is your warranty periodï¼
A: It's 12 months.
Q: Do you provide overseas installation services?
A: Yes, we do.

